Protocols, Projects & Reports
Jaime Garza
Deputy Director
External Affairs Department
916-327-8988
Deputy Director
External Affairs Department
916-327-8988
- General Surface Clearance Procedures
- Operations & Maintenance Protocol for Major Wall Penetrations (Final)
- Operations & Maintenance Protocol for Minor Wall Penetrations (Final)
- State Board of Equalization – Generic Floor Remediation Protocol, Rev 1
- Summary of State Board of Equalization 21st Floor Protocol for Pilot Study, Rev.1
- Revised Investigative Containment and Clearance Procedures - LaCroix Davis Destructive Testing Activities --11th Floor Interior Ceiling Area
- Final Containment Procedures for 23rd Floor South
- Review of Containment Procedures for Floor 23, South Side
- Containment Procedures for Floor 23, South Side
- Records/Documents Inspection and Retrieval Project 22nd, 23rd, 24th Floors and Other Designated Locations
- Personal Contents and Furniture/Equipment Inspection and Cleaning Project 22nd, 23rd, and 24th Floors
- Personal Contents and Furniture/Equipment Inspection and Cleaning Project (Revised) 22nd, 23rd, and 24th Floors
- BOE Revised Ceiling Tile Inspection
- Ceiling Tile Inspection and Management Procedure Addendum
- Industrial Hygiene Work Plan for BOE Building – Pipe Corrosion Investigation, May 3, 2013
Reports
- Stantec BOE Building Infrastructure Study
- Department of General Services’ Schedule of BOE Activities
- LaCroix Davis Final Report Review
- Final LaCroix Davis Building Assessment Report
- Final LaCroix Davis Interim Building Assessment Report
- LaCroix Davis Building Assessment Report Summary
- Floor-by-Floor Indoor Air Quality Test Reports
- Final Report from Facilitated EAP Group Sessions
- 1997 Dreyfuss and Blackford Office Optimization Study